eLaws of Florida

  SECTION 403.0881. Wastewater or reuse or disposal systems or water treatment works; construction permits.  


Latest version.
  • 1The department may issue construction permits under s. 9403.087 10for wastewater systems, treatment works, or reuse or disposal systems based upon review of a preliminary design report, application forms, and other required information, all of which shall be formulated by department rule. Detailed construction plans and specifications shall not be required prior to issuance of a permit or a modification to a permit required under s. 67403.087 68or an operation permit required under s. 75403.0885 76unless such plans and specifications are required to secure federal funding and the project is expected to receive federal funding. Upon a demonstration that a system constructed in accordance with a construction permit issued pursuant to s. 113403.087 114operates as designed, the department shall issue a permit for operation of the system. However, an operation permit may be issued prior to the initiation of discharge, provided the department has reasonable assurance, based on the system design, that the provisions of s. 157403.088 158will be met.
History.-s. 3, ch. 87-125; s. 75, ch. 93-213.