103(2) 104Each application must contain:108(a) 109A detailed, three-dimensional description of the natural gas storage reservoir, including geologic-based descriptions of the reservoir boundaries, and the horizontal and vertical dimensions.
132(b) 133A geographic description of the lateral storage reservoir boundary.
142(c) 143A general description and location of all injection, recovery, withdrawal-only, and observation wells.
156(d) 157A description of the reservoir protective area.
164(e) 165Information demonstrating that the proposed natural gas storage reservoir is suitable for the storage and recovery of gas.
183(f) 184Information identifying all reasonably known abandoned or active wells within the natural gas storage facility.
199(g) 200A field-monitoring plan that requires, at a minimum, monthly field inspections of all wells that are part of the natural gas storage facility.
223(h) 224A monitoring and testing plan for the well integrity.
233(i) 234A well inspection plan that requires, at a minimum, the inspection of all wells that are part of the natural gas storage facility and plugged wells within the natural gas storage facility boundary.
267(j) 268A spill prevention and response plan.
274(k) 275A well spacing plan.
279(l) 280An operating plan for the natural gas storage reservoir, which must include gas capacities, anticipated operating conditions, and maximum storage pressure.
301(m) 302A gas migration response plan.
307(n) 308A location plat and general facility map surveyed and prepared by a registered land surveyor licensed under chapter 472.